Metro Rail Ticket Booking System Dataflow Diagram

Subscribe our YouTube channel for latest project videos and tutorials Click Here

Posted By namita on July 7, 2017

Metro Rail Ticket Booking System Data flow diagram is often used as a preliminary step to create an overview of the Metro Rail without going into great detail, which can later be elaborated.it normally consists of overall application dataflow and processes of the Metro Rail process. It contains all of the userflow and their entities such all the flow of Metro, Routes, Tickets, Fare, Booking Counter, Stations, Login. All of the below diagrams has been used for the visualization of data processing and structured design of the Metro Rail process and working flow.


Zero Level Data flow Diagram(0 Level DFD) of Metro Rail Ticket Booking System :

This is the Zero Level DFD of Metro Rail Ticket Booking System, where we have eloborated the high level process of Metro Rail. It’s a basic overview of the whole Metro Rail Ticket Booking System or process being analyzed or modeled. It’s designed to be an at-a-glance view of Booking Counter,Stations and Login showing the system as a single high-level process, with its relationship to external entities of Metro,Routes and Tickets. It should be easily understood by a wide audience, including Metro,Tickets and Booking Counter In zero leve DFD of Metro Rail Ticket Booking System, we have described the high level flow of the Metro Rail system.

High Level Entities and proccess flow of Metro Rail Ticket Booking System:

  • Managing all the Metro
  • Managing all the Routes
  • Managing all the Tickets
  • Managing all the Fare
  • Managing all the Booking Counter
  • Managing all the Stations
  • Managing all the Login
Zero Level Data flow Diagram(0 Level DFD) of Metro Rail Ticket Booking System

First Level Data flow Diagram(1st Level DFD) of Metro Rail Ticket Booking System :

First Level DFD (1st Level) of Metro Rail Ticket Booking System shows how the system is divided into sub-systems (processes), each of which deals with one or more of the data flows to or from an external agent, and which together provide all of the functionality of the Metro Rail Ticket Booking System system as a whole. It also identifies internal data stores of Login, Stations, Booking Counter, Fare, Tickets that must be present in order for the Metro Rail system to do its job, and shows the flow of data between the various parts of Metro, Tickets, Stations, Login, Booking Counter of the system. DFD Level 1 provides a more detailed breakout of pieces of the 1st level DFD. You will highlight the main functionalities of Metro Rail.

Main entities and output of First Level DFD (1st Level DFD):

  • Processing Metro records and generate report of all Metro
  • Processing Routes records and generate report of all Routes
  • Processing Tickets records and generate report of all Tickets
  • Processing Fare records and generate report of all Fare
  • Processing Booking Counter records and generate report of all Booking Counter
  • Processing Stations records and generate report of all Stations
  • Processing Login records and generate report of all Login
First Level Data flow Diagram(1st Level DFD) of Metro Rail Ticket Booking System

Second Level Data flow Diagram(2nd Level DFD) of Metro Rail Ticket Booking System :

DFD Level 2 then goes one step deeper into parts of Level 1 of Metro Rail. It may require more functionalities of Metro Rail to reach the necessary level of detail about the Metro Rail functioning. First Level DFD (1st Level) of Metro Rail Ticket Booking System shows how the system is divided into sub-systems (processes). The 2nd Level DFD contains more details of Login, Stations, Booking Counter, Fare, Tickets, Routes, Metro.

Low level functionalities of Metro Rail Ticket Booking System

  • Admin logins to the system and manage all the functionalities of Metro Rail Ticket Booking System
  • Admin can add, edit, delete and view the records of Metro, Tickets, Booking Counter, Login
  • Admin can manage all the details of Routes, Fare, Stations
  • Admin can also generate reports of Metro, Routes, Tickets, Fare, Booking Counter, Stations
  • Admin can search the details of Routes, Booking Counter, Stations
  • Admin can apply different level of filters on report of Metro, Fare, Booking Counter
  • Admin can tracks the detailed information of Routes, Tickets, Fare, , Booking Counter
Second Level Data flow Diagram(2nd Level DFD) of Metro Rail Ticket Booking System
Get 6 diagrams only in 300/- or $6.99 USD.
Call or WhatsApp us on +91-8470010001 for more details.

Project Category

Related Data Flow Diagrams (DFD)

First Level Data flow Diagram(1st Level DFD) of Library Application System

Library Application System Dataflow Diagram

Library Application System Data flow diagram is often used as a preliminary step to create an overview of the Library without going into great detail, which can later be elaborated.it normally consists of overall application dataflow and processes of the Library process. It contains all of the...
First Level DFD Order Management System

Order Management System Dataflow Diagram

Order Management System Data flow diagram is often used as a preliminary step to create an overview of the Order Management without going into great detail, which can later be elaborated.it normally consists of overall application dataflow and processes of the Order Management process. It contains...
First Level Data flow Diagram(1st Level DFD) of Project Planning Management

Project Planning Management Dataflow Diagram

Project Planning Management Data flow diagram is often used as a preliminary step to create an overview of the Project without going into great detail, which can later be elaborated.it normally consists of overall application dataflow and processes of the Project process. It contains all of the...
First Level DFD Result Management System

Result Management System Dataflow Diagram

Result Management System Data flow diagram is often used as a preliminary step to create an overview of the Result Management without going into great detail, which can later be elaborated.it normally consists of overall application dataflow and processes of the Result Management process. It...
First Level Data flow Diagram(1st Level DFD) of Finance Management System

Finance Management System Dataflow Diagram

Finance Management System Data flow diagram is often used as a preliminary step to create an overview of the Finance without going into great detail, which can later be elaborated.it normally consists of overall application dataflow and processes of the Finance process. It contains all of the...
First Level DFD Clinic Management System

Clinic Management System Dataflow Diagram

Clinic Management System Data flow diagram is often used as a preliminary step to create an overview of the Clinic without going into great detail, which can later be elaborated.it normally consists of overall application dataflow and processes of the Clinic process. It contains all of the...
First Level DFD Timetable Management System

Timetable Management System Dataflow Diagram

Timetable Management System Data flow diagram is often used as a preliminary step to create an overview of the Timetable Management without going into great detail, which can later be elaborated.it normally consists of overall application dataflow and processes of the Timetable Management process...
First Level Data flow Diagram(1st Level DFD) of Mailing System

Mailing System Dataflow Diagram

Mailing System Data flow diagram is often used as a preliminary step to create an overview of the Mailing without going into great detail, which can later be elaborated.it normally consists of overall application dataflow and processes of the Mailing process. It contains all of the userflow and...
First Level DFD Blood Bank Management System

Blood Bank Management System Dataflow Diagram

Blood Bank Management System Data flow diagram is often used as a preliminary step to create an overview of the Blood Bank without going into great detail, which can later be elaborated.it normally consists of overall application dataflow and processes of the Blood Bank process. It contains all of...
First Level Data flow Diagram(1st Level DFD) of Fast Food Corner Portal

Fast Food Corner Portal Dataflow Diagram

Fast Food Corner Portal Data flow diagram is often used as a preliminary step to create an overview of the Fast Food Corner without going into great detail, which can later be elaborated.it normally consists of overall application dataflow and processes of the Fast Food Corner process. It contains...
Call FreeProjectz WhatsApp FreeProjectz